Big Year

Paul has built an excavator, see here or view a video at  https://youtu.be/SWxnt5rERNU   https://youtu.be/CPnxVSQa4zA We have laid the piping for the major septic lines, they lie underneath the walls.

Currently we are digging the interior wall footings.

All walls interior and exterior will be 3' below ground surface.  This is a frost proof shallow foundation design.



This is where we left off last year 2012, needless to say this is the year that "Shit is Going to Happen"   lol

Start of 2013,Laying the gravel for the base of the foundation
 
Looking better with the plywood forms going up