The latest, on the left ;)
These boards are squared up and nailed to the concrete as a base for the form.
The end wall uprights are nailed to the those boards.
So the wall starts just below the form Plywood
I'll leave these boards until the next wall is done, this saved a little set up time :)
We've set up the side walls for the last tall wall on this side of the building.
We'll go fill some inwalls in before we start this one.
Thanks for sharing this interesting blog with us.My pleasure to being here on your blog..I wanna come back here for new post from your site. motorbike wall decals
ReplyDelete