It's been a bit slow due to weather, but we're making progress. After the trusses were up we started the fascia board 2"x 6" then the drip edge
We purchased our metal roofing from Versaframe, excellent service i might add😀
Took week to finish and turned out well. We used Resisto Plus as the underlay.
Now we'll begin to back fill, level and compact to the black line and start the plumbing
😀😀😀
Cute
A picture can say so much 😉
Looks pretty cool |
Start laying out the required fittings |
Better get these in the right place cause once their in and the concrete is poured that's it. |
Moving the kitchen drainage closer to the wall as it would have been in way while building the wall. |
Assuming the position, LOL |