Thursday, April 28, 2016

About Time! :)

 
 
 
                                             Finally the frost is gone, Time to Build!




Ah the Morning Sun
 


Let the mixing begin


Shovel, Shovel
 
Ready to break a sweat? Hope so! LOL











Thump Thump Thump,,,





One,,One Lift AH AH AH AH
Slowly but surely  

                                                            
Been a bit slow going as it's our first one of the year, it can only get faster ;)



But First, Let's tweet it, LOL

 Last Lift!  YAY!

Time to make the cap, it's been a long day.





               

Well, there's the first one down for the year. Left side front.


Tuesday, February 9, 2016

Rammed Earth Workshop



Rammed earth training courses being offered over the summer of 2016.  Learn to build with what mother nature provides.

We are a husband and wife team working towards our dream home.  We have been building rammed earth structures on our property for the last three years, starting with driveway markers, an animal shelter and last summer we completed half of our house walls.  We have gained knowledge through extensive research and hands on courses.  Please feel free to have a look at our blog chronicling our progress.

We have one more summer to finish our walls and want to make sure we give anyone interested the opportunity to learn rammed earth in an applicable way.  Rammed earth is cost effective, beautiful and will last many lifetimes over, nothing compares to the feeling of being surrounded by these magnificent walls.

Come and join us in building a rammed earth residence near beautiful Christopher Lake Saskatchewan.     The course objective is to give participants experience and knowledge to build a rammed earth residence in a hands on setting.

The course will cover:

· form set up and dismantling

· material mixing

· ramming

· in wall services (plumbing and wiring)

· insulation

· rebar stabilization

Courses extends over 5 days maximum with a minimum of two days participation.  Cost is $100/day.  To maximize experience and time to relay the most information 4 to 5 days is recommended.  There are limited spots available each week so book your week early to get your spot.

Accommodation can be arranged in the Village of Christopher Lake which include small cabins and yurts.  Transportation will be provided from Christopher Lake to site.

Camping is also available on site with washroom/shower/kitchen and outdoor fire pit for use.

Christopher Lake has two basic small grocery stores, restaurants, bar, farmers market on Saturday morning, and a local beach.

Families welcome.

Dates offered:

  • June 3-7
  • June 17-21
  • July 1-5
  • July 15-19
  • July 29-Aug 2
  • Aug 12-16
  • Aug 26-30
  • Sept 9-13
  • Sept 23-27

Students are encouraged bring; work boots, eye protection, and gloves.
















Thursday, September 3, 2015

#rammedearth #rammedearthwall Southwest bedroom walls

We had set a goal of two big walls this last week and met that goal with great success :)


                                        Here we are starting with nailing down the bottom boards. Getting good tools helps along every step :)

                        


Then the end wall forms go up and the side panels, everything gets levelled then screwed in place.












Using the Bobcat to mix makes quick work of the pile.














  And here we go,,,,,,,, 
  Over and over again :) 
But it's so worth it.

Here we are preparing for the cap.

 Always a good feeling to reach the top. 



Up when the sparrows fart, to take the forms down.










Like opening presents  :) 
 

We have the two window walls to ram then this bedroom will be officially #rammed. 

Sweet! 


Thursday, August 20, 2015

#rammedearth first #interior wall #christopherlake #saskatchewan

This wall took the longest to form and the longest to ram thus far. But sure turned out nice!

Making sure everything is straight to begin with. Anchoring the bottom plates 

Standing up the uprights that will be holding all the vertical boards in place. 
Then the form Plywood goes into the frame. Brad nails are used to tack it together (air nailer) 
 
Put the electrical boxes in while there is still room, Eeek getting narrow! Just about done. 


 
Took a week and a half (as life gets in the way)
But there it is ready for material.


Here comes the first load :) 
Threaded the other end of a pipe clamp pipe to make an extension for the tamper ;) 
Ramming away,,,,,,,,,,,, 

Time for a selfie? No silly, time for color! 

Made it to the height of the electrical boxes then,, 
The rain came for a little bit. Time for a break anyways. 

 
One more lift Sweet! 
Towelling the cap


The best part of building rammed earth is stripping the form. 



Happy Happy, only 29 more walls to go. Palm face 
This wall was quite a bit more work than we thought, but at least there is something to show for it. Something that is super cool, won't rot, blow away. Lots of people say that we're crazy for doing this, we could have a house like everyone else. That wouldn't require so much work, fuck that! Exercise your mind and your body. Hope you enjoyed this wall as much as we have. 
;) 

P.S.